ROUGH3
A Thousand Tonnes of Ingenuity
Four Double Shield TBMs, really tough gneis and water pressures of up to 12 bar – the Follo Line is undoubtedly a technical and logistical top-challenge in international tunnel construction. Smart engineering solutions, unshakeable willpower and mutual trust between all partners are necessary to make the ambitious hard rock project a success.
UNIQUE EXPERTISE
HARD ROCK TBMS DELIVERED SINCE 2000 ON TIME AND IN TOP QUALITY
FACING A REALLY TOUGH MISSION?
WE ARE READY!
海瑞克电子杂志《全方位》
海瑞克《全方位》是海瑞克集团出版的电子杂志。在我们的在线刊物中,记者、摄影师以及编辑致力为大家呈现来自全球机械化隧道建设领域激动人心的最新故事。
欢迎订阅我们的电子刊物,以及时获取最新刊物的发布信息。